The Beginning and Evolution: PAFMAC Story Part 12
The Beginning and Evolution: PAFMAC
Story Part 12
|
9. 2 PAFMAC: Business Development in North America
Successful Installation of PAFMAC at the Kitano
Hotel New York was Our First Overseas Project.
LOCATION: New York, NY
CUSTOMER: The Kitano Hotel New York
PRODUCT: PAFMAC Ceiling Unit
During the installation of PAFMAC in
the Kitano Hotel New York, only the rooms that were being worked on needed to
be out of order at any given time. The project began in June 2015 and by May
2016, every guest room in the hotel had been completed.
"I was very excited that
someone was offering a system that was so much better than the 4-Pipe solution.
It was cheaper, required less downtime, fewer permits, and was easier to
install."
"We installed the system in several rooms to see how it would work. I found out how easy it was to install. The scope of work and time required for installation were the most important aspect for us. We were thrilled that we could complete the installation in only one day!"
(Zack Zahran, General Manager of the Kitano Hotel)
"We installed the system in several rooms to see how it would work. I found out how easy it was to install. The scope of work and time required for installation were the most important aspect for us. We were thrilled that we could complete the installation in only one day!"
(Zack Zahran, General Manager of the Kitano Hotel)
Results
Guest complaints about room
temperature disappeared.
Annual energy costs dropped by 18%.
The repairs were completed with
minimal downtime.
“We were really surprised at how
well the system works and how easy it was to install. The comfort of our guests
is always paramount and the ability for each room to control its own heating
and cooling is a significant upgrade on the quality of service we provide.”
(Zack Zahran, General Manager of the Kitano Hotel)
We headed to
New York to participate in the HX “The Hotel Experience” at the JAVITS
CONVENTION CENTER from November 8th to 10th, when the
PAFMAC installation was about 40% completed at the Kitano Hotel New York, and
prior to the event, we held a press conference at the hotel on November 4th.
Hotel owners, consultants and the press were invited to attend and had the
opportunity to visit the actual rooms with PAFMAC installed.
The press
conference and the HX “The Hotel Experience” exhibit both experienced large
turnout.
http://usa.pmac.co.jp