The Beginning and Evolution: PAFMAC Story Part 7
The Beginning and Evolution: PAFMAC Story
5.
Integration
of PFMAC system at other hotels
Upon directly approaching other high
potential hotels even after successful installation of PAMAC system in ANA INTERCONTINENTAL-TOKYO
(formally known as ANA Hotel Tokyo), some people were skeptical, saying, “Is
that really possible?”
However, upon actually taking
the candidate hotel members to ANA Hotel for a tour of their guest rooms, the
skeptics expressed great surprise when they discovered a system that they only
thought was possible in a dream.
The
person in charge of the AC engineering at ANA Hotel Tokyo wrote an article in
an academic journal for building service engineers, and as a result, many
people in the building equipment industry became aware of PAFMAC system. We
began to receiving an overwhelming number of inquiries from the building system
engineers after the publication, so we had them introduce us hotels with high
number of AC complaints, and in turn, we gave a tour of hotels with PAFMAC
system in operation.
In some of the hotels, we received full volume
orders after partial testing in few rooms. Also, after a particular hotel
decided to integrate our system, many hotels within their group followed and
installed PAFMAC.
Construction
period and out of order room examples
(results vary due to each situation)
Hotels
|
Units
|
Length
|
Out of order rooms
|
A Hotel
|
136
|
60days
|
Just
the floor being worked
|
B Hotel
|
153
|
30days
|
Entire building then completed floors
returned operative immediately
|
C Hotel
|
400
|
240days
|
Just the floor being worked
|
D Hotel
|
900
|
270days
|
Floor being worked and above & below
floors
|