The Beginning and Evolution: PAFMAC Story Part 7

The Beginning and Evolution: PAFMAC Story




5.      Integration of PFMAC system at other hotels

  Upon directly approaching other high potential hotels even after successful installation of PAMAC system in ANA INTERCONTINENTAL-TOKYO (formally known as ANA Hotel Tokyo), some people were skeptical, saying, “Is that really possible?”

However, upon actually taking the candidate hotel members to ANA Hotel for a tour of their guest rooms, the skeptics expressed great surprise when they discovered a system that they only thought was possible in a dream.

 The person in charge of the AC engineering at ANA Hotel Tokyo wrote an article in an academic journal for building service engineers, and as a result, many people in the building equipment industry became aware of PAFMAC system. We began to receiving an overwhelming number of inquiries from the building system engineers after the publication, so we had them introduce us hotels with high number of AC complaints, and in turn, we gave a tour of hotels with PAFMAC system in operation.

 In some of the hotels, we received full volume orders after partial testing in few rooms. Also, after a particular hotel decided to integrate our system, many hotels within their group followed and installed PAFMAC.
 




           Construction period and out of order room examples
            (results vary due to each situation)





Hotels

Units

Length

Out of order rooms

A Hotel

136

60days

Just the floor being worked

B Hotel

153

30days

Entire building then completed floors returned operative immediately

C Hotel

400

240days

Just the floor being worked

D Hotel

900

270days

Floor being worked and above & below floors
 
   Hotels with PAFMAC system (Partial listing)
 
http://usa.pmac.co.jp/
 

 
 
 
 
 
 



 





 
 




Popular posts from this blog

Recent PAFMAC Reviews in Japan Part 3

Recent PAFMAC Reviews in Japan Part 2

Recent PAFMAC Reviews in Japan Part 1