Recent PAFMAC Reviews in Japan Part 5

Image
Upgrading the air conditioning system, co-developed by the hotel and the manufacturer. PAFMAC realizes all-year-round cooling and heating system while using 2-pipe fan coil system. As the wave of new hotel openings continue, great effort is poured into rebranding and new brand generation to differentiate from the competitors, and therefore air conditioning unit, which provides the most fundamental comfort in guest rooms, is gaining great attention. Mr. Ryuji Ikegami, Managing Officer of Prince Hotels, Inc. and Mr. Mikio Wakayama, President of NIPPON PMAC Co., discuss PAFMAC, which successfully converts conventional 2-pipe fan coil system into an all-year-round cooling and heating system. Ryuji Ikegami, Managing Officer, Principal Architect & Designer, Prince Hotels, Inc. Mikio Wakayama, CEO of NIPPON PMAC Co., Ltd. In addition to the basic functions of air conditioning, quiet operation and energy conservation as key factors. Moderator: To start, I heard that the new corporate HQ fo

Recent PAFMAC Reviews in Japan Part 4

Image
Oiso Prince Hotel Hotel type: Resort Hotel Guest rooms: 208 rooms Guest room renovation      Oiso Prince Hotel installed PAFMAC when renovating the guest room in April 2017 and achieved de-centralized all-year-round cooling and heating. With the spa facility that opened in July, we have been receiving high remarks by our customers.       PAFMAC Gives Hotels 4-pipe Climate Control with Existing 2-Pipe Systems. Only the room installing PAFMAC needs to be out of order. Easy, quick installation. Great energy savings.   http://usa.pmac.co.jp  

Recent PAFMAC Reviews in Japan Part 3

Image
Taken from an article published in the Japanese weekly magazine, “HOTERES”. Richmond Hotel Tokyo Mejiro Hotel type: Business Hotel Guest rooms: 145 rooms Guest room renovation Air conditioning was our main focus when renovating. Our hotel had a conventional two-pipe fan coil system using cold and hot water, so before the renovation, we had always received many complaints about the room being too hot or too cold during spring and autumn seasons The hotel's storage room was full because it had piles of heating appliances and fans that we lent out to our guests upon request. We were searching for a cooling and heating system that could be interchanged individually in each room while using our existing 2 pipe fan coil system. We were introduced to PAFMAC by an air conditioning consultant. Our hotel converted from 2-pipe fan coil system to PAFMAC. When trouble occurs in any room, the hotel does not have to stop operating any other room, since PAFMAC works independe

Recent PAFMAC Reviews in Japan Part 2

Image
Recent PAFMAC Reviews in Japan Part 2 Taken from an article published in the Japanese weekly magazine, “ HOTERES”.   NIPPON SEINENKAN HOTEL Hotel types: City Hotel Guest rooms: 220 rooms New construction     Our previous building was also a two-pipe air conditioning system and it had to be centrally controlled and locked in either cooling or heating mode, and it would take a full day to switch from one to the other mode. Therefore, we were always concerned about the weather every day during the changing of the seasons to determine when to switch from cooling mode to the heating or vice versa. Given this experience, it was critical for us to have a de-centralized all-year-round cooling and heating system, so we had requested it directly to an architectural firm. The ability to switch between cooling and heating anytime throughout the year and to have the flexibility to do it individually in each room. However, if we

Recent PAFMAC Reviews in Japan Part 1

Image
Recent PAFMAC Reviews in Japan Part 1 Taken from an article published in the Japanese weekly magazine, “ HOTERES”. KEIO PLAZA HOTEL Hotel types: Luxury hotel Guest rooms: 1,435 rooms Guest room renovation For us, it was difficult to manage air conditioning to provide comfort during the in-between months, which are mid-March to end of May, and from beginning of November to mid-December. This is because if we are sending cold water to the two-pipe system, we cannot respond individually to rooms requesting heating, such as "I want to turn on the heater in my room because I am catching a cold". In the past, we lent out blankets and heating appliances when customers were too cold. And on the other hand, we lent out fans when it was too hot. On large volume days, we received more than 20 requests from our customers for these appliances. We tested PAFMAC in 4 rooms the year before the full installation and we

The Beginning and Evolution: PAFMAC Story Part 13

Image
The Beginning and Evolution: PAFMAC Story Part 13 The Beginning and Evolution: PAFMAC Story   10.   PAFMAC: Business Development in North America 2   Successful Installation of PAFMAC at the PAFMAC: Business Development in North America 2   Successful Installation of PAFMAC at the IBEROSTAR 70 Park Avenue was Our Second Overseas Project.   Installation at the IBEROSTAR 70 Park Avenue Location: 70 Park Avenue, New York, NY Customer: Citusa Park Avenue LLC Product:  PAFMAC Floor unit Challenges: IBEROSTAR 70 Park Avenue is one of the 5 Star resort hotel chains that operates mainly in resort areas across Europe and Latin America, and in the United States, the New York establishment is the first one and flagship in USA soil. For the IBEROSTAR group, it was a highly anticipated expansion into the NY market in 2016 and it had great expectations. IBEROSTAR 70 Park Avenue is a 4-Star boutique hotel, located in Mi

The Beginning and Evolution: PAFMAC Story Part 12

Image
The Beginning and Evolution: PAFMAC Story Part 12                  The Beginning and Evolution: PAFMAC Story   9. 2 PAFMAC: Business Development in North America   Successful Installation of PAFMAC at the Kitano Hotel New York was Our First Overseas Project.   LOCATION: New York, NY  CUSTOMER: The Kitano Hotel New York PRODUCT: PAFMAC Ceiling Unit   During the installation of PAFMAC in the Kitano Hotel New York, only the rooms that were being worked on needed to be out of order at any given time. The project began in June 2015 and by May 2016, every guest room in the hotel had been completed.   "I was very excited that someone was offering a system that was so much better than the 4-Pipe solution. It was cheaper, required less downtime, fewer permits, and was easier to install." "We installed the system in several rooms to see how it would work. I found out how easy it